Used 2021 BMW M4 Base

Stock: PST1958VIN: WBS53AZ0XMCG15077

Stock: PST1958 VIN: WBS53AZ0XMCG15077

Used 2021 BMW M4 Base

Detailed Pricing
Farrish WOW Price:
$59,495
Processing Fee:
$999
Farrish WOW Price:
$60,494

Get Pre-Approved
View Disclaimer

Our quotes include Freight or Destination charges that most competitors will add to their advertised pricing. We offer price quotes that do not include military discounts, recent college grad bonuses, or Subaru program discounts since many customers do not qualify. Additional savings are available if you happen to qualify. Solterra pricing is based on only Leasing and will only qualify for leasing and is inclusive of all rebates available to every customer. We also do not add additional reconditioning or certification fees to our posted online pricing. Most of our competitors automatically include these discounts in their price quotes. We're just mentioning this as a courtesy to help you get accurate price quotes while researching for your new vehicle. Our pricing is aggressive and may require financing through dealer choice financing. Please see your dealer for details.

We make every effort to provide accurate information; please verify options and price before purchase; Farrish is not responsible for errors or omissions. All vehicles subject to prior sale. Quoted price available on in-stock units only and may require financing and or leasing based on incentives available. All prices are exclusive internet prices only for VA, MD, and D.C. customers. An adjusted market value will be added to all new vehicle prices for customers outside of VA, MD and D.C. Financing is subject to approved credit through Subaru Motors Finance. Price plus tax, tags, processing fee of $999 VA and may require Dealer Choice financing and or leasing based on incentives. Additional fee may apply to new vehicles transferred from other locations. Manufacturer incentives are valid during the time period set by the manufacturer and are subject to change without notice. Additional manufacturer incentives may apply to those who qualify and may lower the sales price. See dealer for details.

*While every reasonable effort is made to ensure the accuracy of this information, we are not responsible for any errors or omissions contained on these pages. Please verify any information in question with Farrish Subaru.

Vehicle Highlights

Views
226
Overview
PST1958
Stock
WBS53AZ0XMCG15077
VIN
37,760
Miles
Coupe
Body
RWD
Drivetrain
Brooklyn Gray Metallic
Exterior
Black
Interior
112.5
Wheelbase
3.0L I6 Turbocharged DOHC 24V LEV3-ULEV70 473hp
Engine
Gas
Fuel
6-Speed Manual
Transmission
2
Doors
23*
Highway MPG (EPA estimate)
16*
City MPG (EPA estimate)
Description
**BROOKLYN GRAY** LOW MILES** Elevate your driving experience with this exceptional 2021 BMW M4 Base. Meticulously maintained and boasting a sleek Gray exterior, this one-owner vehicle is primed to impress. - BACKUP CAMERA - LEATHER - NAVIGATION - ONE OWNER - WHEELS: 19" X 9.5" FR/20" X 10.5" RR SILVER - CARBON FIBER TRIM - PARKING ASSISTANCE PACKAGE - EXECUTIVE PACKAGE Beneath the hood, a powerful 3.0L I6 Turbocharged engine delivers an exhilarating 473 horsepower, mated to a smooth 6-Speed Manual transmission and RWD system. With an EPA-estimated 16 city / 23 highway MPG, this M4 offers an exceptional balance of performance and efficiency. The Executive Package elevates your driving experience with premium features including a Head-Up Display, Power Tailgate, Heated Steering Wheel, and Wireless Charging. The Parking Assistance Package further enhances convenience with Parking Assistant Plus and a Drive Recorder. Luxurious Merino Leather upholstery, M Sport Seats, and a harman/kardon Surround Sound System create an inviting and technologically advanced cabin. Cutting-edge connectivity is provided through Apple CarPlay, Android Auto, and a WiFi Hotspot. Safety is paramount, with advanced driver assistance technologies like Adaptive Suspension, Adaptive LED Headlights, and a comprehensive suite of airbags. Rest assured, this BMW M4 is primed to deliver an exceptional driving experience. Experience the power, precision, and premium features of this 2021 BMW M4 Base. Schedule your test drive today and discover the joy of owning this exceptional vehicle.
Features
Brake Assist

Brake Assist

Heated Seats

Heated Seats

Heated Side Mirrors

Heated Side Mirrors

Keyless Entry

Keyless Entry

Memory Seats

Memory Seats

Navigation

Navigation

Parking Assist

Parking Assist

Power Seat

Power Seat

Power Windows

Power Windows

Push Button Starting

Push Button Starting

Rain Sensing Wipers

Rain Sensing Wipers

Rear Air Conditioning

Rear Air Conditioning

Rearview Camera

Rearview Camera

Satellite Radio

Satellite Radio

Security System

Security System

Side-Impact Air Bags

Side-Impact Air Bags

Stability Control

Stability Control

WiFi Hotspot

WiFi Hotspot

Heated Steering Wheel

Heated Steering Wheel

Details
Model Overview
The BMW 4-Series is available in two different body styles: coupe and convertible. There are two engines available in the 4-Series: 430i models are powered by a turbocharged 2.0L four-cylinder engine that makes 255 horsepower. Power is sent to the rear wheels via an 8-speed automatic transmission, while a 6-speed manual is available.

The performance-oriented M4 gets a 3.0L twin-turbocharged six-cylinder. It produces an impressive 473 horsepower and 406 lb-ft of torque. The M4 Competition uses the same engine mated to an 8-speed automatic transmission that's tuned to produce 503 horsepower. M4 models are rear-wheel-drive only.

The M440 is available in RWD and AWD and it's powered by a 3L turbocharged 6-cylinder engine that produces 382 horsepower.

Trim levels are all similarly equipped across the range, notable features on the 4-Series include 18-inch alloy wheels, LED headlights, heated side mirrors with a power folding function, 12-way power adjustable front seats, a leather-wrapped steering wheel, Bluetooth connectivity, a automatic climate control with separate rear controls, BMW's iDrive system with an 8.8-inch display screen, cruise control and rain-sensing wipers.

The M4 comes with a few more standard items, such as adaptive suspension, touch-screen navigation, and a 16-speaker surround audio system.

Since the various trims feature similar equipment levels, there are several options and option packages available on the 4-Series.

Available safety equipment includes front and rear parking sensors, a lane departure warning system, blind spot warning, forward collision mitigation, rear collision warning, a pedestrian detection system, a driver attention alert and a traffic sign information system.
Model Strengths
Stylish Body
Great Handling
Sporty And Powerful Engines
Usable Back Seats
Variety Of Body Styles
Available All-wheel Drive
M4's Unmatched Performance
Model Changes
For 2021 the BMW 4-series and M4 are both completely redesigned. The 430 Gran Coupe, 440i, and 440 Gran Coupe models are no longer available while an M440 has been added to the lineup.
Model Value
The BMW 4-Series is a stylish car that offers most of the performance and styling of a sports car without compromising much in terms of comfort or practicality. It features sleek, low styling and is available in a few different body styles, including as a convertible. Performance is brisk, but ride and comfort have been carefully balanced to provide a driving experience that is both entertaining and somewhat luxurious.

The BMW 4-Series competes with sedans and coupes such as the Audi A5, the Mercedes Benz C-Class and the Lexus IS. The top-of-the-line M4 offers blistering performance and razor-sharp handling but in a practical coupe package.
Features
Navigation System
Executive Package
Parking Assistance Package
16 Speakers
AM/FM radio: SiriusXM with 360L
harman/kardon Surround Sound System
harman/kardon Speakers
Radio data system
Radio: AM/FM Audio System
SiriusXM Satellite Radio
Air Conditioning
Automatic temperature control
Front dual zone A/C
Rear air conditioning
Rear window defroster
Head-Up Display
Lumbar Support
Memory seat
Power driver seat
Power steering
Power windows
Remote keyless entry
Steering wheel mounted audio controls
Adaptive suspension
Four wheel independent suspension
Speed-sensing steering
Traction control
4-Wheel Disc Brakes
ABS brakes
Dual front impact airbags
Dual front side impact airbags
Emergency communication system: BMW Assist eCall
Front anti-roll bar
Knee airbag
Low tire pressure warning
Occupant sensing airbag
Overhead airbag
Rear anti-roll bar
Power Tailgate
Brake assist
Electronic Stability Control
Exterior Parking Camera Rear
Auto High-beam Headlights
Delay-off headlights
Fully automatic headlights
Panic alarm
Security system
Speed control
Auto-dimming door mirrors
Bumpers: body-color
Extended Shadowline Trim
Heated door mirrors
Icon Adaptive LED Headlights w/Laserlight
Parking Assistant Plus
Power door mirrors
Spoiler
Turn signal indicator mirrors
Auto-dimming Rear-View mirror
BMW Assist eCall
BMW TeleServices
Carbon Fiber Trim
Compass
ConnectedDrive Services
Drive Recorder
Driver door bin
Driver vanity mirror
Front reading lights
Garage door transmitter
Gesture Control
Heated Steering Wheel
Illuminated entry
Leather Shift Knob
Live Cockpit Pro w/Navi
Outside temperature display
Overhead console
Passenger vanity mirror
Rear reading lights
Rear seat center armrest
Sport steering wheel
Tachometer
Telescoping steering wheel
Tilt steering wheel
Trip computer
WiFi Hotspot
Wireless Charging
Extended Merino Leather Upholstery
Front Bucket Seats
Front Center Armrest
Heated Front Seats
Heated front seats
M Sport Seats
Power Front Seats
Power passenger seat
Split folding rear seat
Passenger door bin
Alloy wheels
Wheels: 18" x 9.5" Fr/19" x 10.5" Rr M Double-Spk
Wheels: 19" x 9.5" Fr/20" x 10.5" Rr Silver
Rain sensing wipers
Speed-Sensitive Wipers
Variably intermittent wipers
BACKUP CAMERA
NAVIGATION
LEATHER
ONE OWNER
PUSH BUTTON START
APPLE CAR PLAY / ANDROID AUTO
Mechanical
Engine: 3.0L 6-Cylinder TwinPower Turbo
Transmission: 6-Speed Manual
Engine Auto Stop-Start Feature
Transmission w/Driver Selectable Mode
Rear-Wheel Drive
3.46 Axle Ratio
Engine Oil Cooler
70-Amp/Hr Maintenance-Free Battery w/Run Down Protection
Regenerative Alternator
Gas-Pressurized Shock Absorbers
Front And Rear Anti-Roll Bars
Automatic w/Driver Control Ride Control Sport Tuned Adaptive Suspension
Electric Power-Assist Speed-Sensing Steering
15.6 Gal. Fuel Tank
Dual Stainless Steel Exhaust w/Chrome Tailpipe Finisher
Strut Front Suspension w/Coil Springs
Multi-Link Rear Suspension w/Coil Springs
4-Wheel Disc Brakes w/4-Wheel ABS, Front And Rear Vented Discs, Brake Assist, Hill Hold Control and Electric Parking Brake
Electro-Mechanical Limited Slip Differential
Exterior
Wheels: 18" x 9.5" Fr/19" x 10.5" Rr M Double-Spk -inc: Style 824M, Orbit grey
Forged Aluminum Wheels
Tire Mobility Kit
Body-Colored Front Bumper
Body-Colored Rear Bumper w/Black Rub Strip/Fascia Accent
Rocker Panel Extensions
Black Side Windows Trim and Black Front Windshield Trim
Body-Colored Door Handles
Body-Colored Power Heated Side Mirrors w/Driver Auto Dimming, Power Folding and Turn Signal Indicator
Fixed Rear Window w/Defroster
Light Tinted Glass
Speed Sensitive Rain Detecting Variable Intermittent Wipers
Galvanized Steel/Aluminum/Composite Panels
Lip Spoiler
Black Grille
Front License Plate Bracket
Trunk Rear Cargo Access
Perimeter/Approach Lights
LED Brakelights
Headlights-Automatic Highbeams
Entertainment
Radio w/Seek-Scan, Clock, Speed Compensated Volume Control, Steering Wheel Controls, Voice Activation, Radio Data System, External Memory Control and 20 Gb Internal Memory
16 Speakers
464w Premium Amplifier
Streaming Audio
Integrated Roof Antenna
harman/kardon Surround Sound System
Bluetooth Wireless Phone Connectivity
2 LCD Monitors In The Front
Artti Real-Time Traffic Display
Interior
40-20-40 Folding Bench Front Facing Fold Forward Seatback Rear Seat
Manual Tilt/Telescoping Steering Column
Fixed Rear Windows
Front Cupholder
Rear Cupholder
Compass
Valet Function
Power Fuel Flap Locking Type
Remote Releases -Inc: Comfort Access Proximity Cargo Access
Garage Door Transmitter
Cruise Control w/Steering Wheel Controls
HVAC -inc: Underseat Ducts and Console Ducts
Illuminated Locking Glove Box
Driver Foot Rest
Interior Trim -inc: Aluminum Instrument Panel Insert, Aluminum Console Insert and Metal-Look Interior Accents
Full Cloth Headliner
Leatherette Door Trim Insert
Leather/Metal-Look Gear Shifter Material
Day-Night Auto-Dimming Rearview Mirror
Driver And Passenger Visor Vanity Mirrors w/Driver And Passenger Illumination, Driver And Passenger Auxiliary Mirror
Full Floor Console w/Covered Storage, Mini Overhead Console and 3 12V DC Power Outlets
Front And Rear Map Lights
Fade-To-Off Interior Lighting
Full Carpet Floor Covering -inc: Carpet Front And Rear Floor Mats
Carpet Floor Trim and Carpet Trunk Lid/Rear Cargo Door Trim
Cargo Area Concealed Storage
Cargo Features -inc: Tire Mobility Kit
Cargo Space Lights
Memory Settings -inc: Driver Seat and Door Mirrors
Tracker System
ConnectedDrive Services
Instrument Panel Covered Bin, Driver And Passenger Door Bins
Power 1st Row Windows w/Driver And Passenger 1-Touch Up/Down
Delayed Accessory Power
Driver Information Center
Redundant Digital Speedometer
Outside Temp Gauge
BMW TeleServices
Manual Adjustable Front Head Restraints and Fixed Rear Head Restraints
Front Center Armrest and Rear Center Armrest
Perimeter Alarm
Immobilizer
3 12V DC Power Outlets
Air Filtration
Safety
Side Impact Beams
Dual Stage Driver And Passenger Seat-Mounted Side Airbags
Blind Spot Detection Blind Spot
Rear Collision Prevention
Lane Departure Warning
Collision Mitigation-Front
Driver Monitoring-Alert
Tire Specific Low Tire Pressure Warning
Dual Stage Driver And Passenger Front Airbags
Curtain 1st And 2nd Row Airbags
Airbag Occupancy Sensor
Driver And Passenger Knee Airbag
Outboard Front Lap And Shoulder Safety Belts -inc: Pretensioners
Similar Vehicles

2023 BMW 2 Series M240i

Stock: PZ13315

Quick View

2021 BMW 4 Series M440i xDrive

Stock: PZ13283

Quick View

2021 BMW 3 Series M340i xDrive

Stock: PZ13317

Quick View

2024 Ford Mustang Dark Horse

Stock: PSZ1939

Quick View

Dealer FAQs

Can I get financed for an auto loan at Farrish of Fairfax?

Getting financed with us is fast and fun. Whether you’ve always enjoyed a sterling credit history, are currently working on improving your credit score even more, or this is your first time buying a car, you can count on the friendly experts at Farrish of Fairfax to make the whole process transparent and easy to understand. To learn more and get the ball rolling on the right loan for your unique financial situation, call 123-456-7890 or apply online now. 

What is the financing process like at Farrish of Fairfax?

Easy and relaxed. Our primary goal is your total satisfaction, so we provide you with as much time and expert insight as you need to properly consider all of your loan options. This commitment to friendly, honest, and fair service is truly a breath of fresh air and ensures that you drive away happy, satisfied, and behind the wheel of the vehicle you've always wanted.

What are the steps in the financing process at Farrish of Fairfax?

Great question. Securing a competitive loan from Farrish of Fairfax takes only three easy steps. First up is to either apply online for pre-approval via our quick and convenient online credit application or call 123-456-7890. From here, one of our financing experts will connect with you to go over the details of your loan offers and ensure that you have everything you need to make a smart and informed decision.

After reviewing your proposed loan terms and consulting with our financial advisors and your trusted personal confidants (friends, family members, etc.), there is only one step left: Finalizing the perfect loan for you via a simple and respectful process. By following these three short steps, you can make the most of the best loan experience here in Fairfax.

What is involved in securing an auto loan in Fairfax VA?

The answer to this question includes a variety of factors, such as:

  • Your car's purchase price
  • Your trade in and equity position
  • If the vehicle you are purchasing is new or used
  • The length of your existing loan's life
  • Your current credit score
  • How much you are choosing to invest in a down payment

People from all around Fairfax come to purchase a clean car, truck, or SUV from our used car lot each and every day. Most loans prepared by our team are entirely unique, so the factors that will shape your bank loan will depend on your specific situation, desires, and needs.

Our expert financial professionals are happy to find and present lots of great offers to ensure that you are in complete control and that you are receiving the best deal possible on the loan you need. Our customers make great and informed decisions based on all of their available options thanks to a perfectly transparent process that we take seriously.

Who can I call at Farrish of Fairfax to get the financing process started?

Any of our amazing specialists will be more than happy to help you get the ball rolling on your dream car. All you have to do is dial 123-456-7890 when you have a few free moments and you'll soon see that getting approved for a car loan at Farrish of Fairfax is quick, easy, and convenient.

© 2026 Farrish of Fairfax